The side-effect budget

A reference shipped with the skill · 1,245 words

The side-effect budget

The budget is the artifact this skill exists to produce. It is written before the first edit, it is derived from the blast map rather than from recollection, and it is the thing a reviewer checks the diff against afterwards. Written after the work, it matches the diff exactly, proves nothing, and reads exactly like diligence — which is why the ordering is not a stylistic preference.

A budget answers one question that a plan does not: what is this change not allowed to touch? The answer is "everything not listed", and that default is the whole mechanism.

The artifact

BUDGET  <change name>  base <sha>  band <light|normal|deep>  shape <feature|refactor|migration>
map: <blast map reference or "declared, no map — light band">

ALLOWED
  path or symbol                     operation   surface           note
  src/ingest/parse.ts                edit        callers           the signature change itself
  src/ingest/__tests__/parse.test.ts add         tests-and-guards  rung-1 guard for callers
  migrations/<version>_drop_status   add         data-contracts    file only — NOT applied

EXPECTED EFFECT
  surface            what changes there                              break time
  callers            three call sites take one fewer argument        compile
  data-contracts     the column stops being selected                 runtime
  jobs               nothing — the nightly job reads a view          none (searched, control fired)

OUT OF BOUNDS
  the four standing classes (below), plus:
  - the shared formatter config: touching it rewrites files this change never read
  - the deploy workflow: it is the gate this change is judged by

ON BREACH
  stop → re-enter the mapping skill with the new fact → extend | split | abandon
  never: absorb silently

Plain text is enough. What matters is that each row is checkable against the eventual diff by someone who was not there.

Deriving the touch-set from the map

The map is per surface; the budget is per thing you will edit. The conversion is mechanical and has three rules:

  1. Every ALLOWED entry names a surface from the map. An entry that cannot be attributed to a surface is either an unmapped surface — go back and map it — or work that belongs to a different change.
  2. Every affected surface appears under EXPECTED EFFECT, including the empty ones. A surface the map searched and found clean carries none, plus the search and whether its control fired. An empty row and an absent row look identical to a reader six days later, and only one of them is evidence.
  3. A node the map marks affected but not changed does not become an ALLOWED entry by default. Affected means something happens there; it does not mean you edit it. Promoting an affected node to an allowed edit is a decision, and it gets its own row and its reason.

The awkward entries, declared on purpose

These are the ones that get left out and then dominate the diff:

  • Generated output — build artifacts, type definitions, an atlas or registry that a script regenerates. Declare which generator you will run, and that its output is expected.
  • Lockfiles — a dependency change is a change to the dependency graph and belongs in the map. An incidental lockfile churn from a different tool version is a side effect.
  • Formatter and linter sweeps — a formatter run over files this change never read is a side effect with a tidy diff. Declare the scope, or exclude the tool from the run.
  • Import reordering and auto-fixes — the editor's helpfulness is still your diff.
  • Snapshot updates — updating a snapshot is asserting the new value is correct. If it is correct, that is a rung-1 gate observation and belongs on the ladder; if it is unexamined, it is a regression being written into the baseline.

The four standing out-of-bounds classes

Outside every budget by default, regardless of what the map contains. Each is released only by a consent that names the specific act, at the moment of the act — never by a general approval given at the start of the run, which was granted before anyone knew what the act would be.

Class What it covers Not covered (and therefore fine)
Applying a migration executing the schema change against a live database; running a tool that applies pending files as a side effect writing the migration file, reviewing it, dry-running it against a disposable local database
Writing to production data inserts, updates, deletes, a "small" backfill, running a job whose effect is a write, a script pointed at production credentials reads, a query plan, a count, the same write against a local fixture
Deleting anything not restorable from history data, storage objects, branches, tags, secrets, and code whose only copy is the working tree deleting committed code, which a revert restores
Sending an outbound message to a person mail, chat, ticket comment, notification, a status change that pages someone drafting the message and showing it

Add the repository's own standing exclusions to the same list. Two recur everywhere: history rewriting (force-push, rebase of a shared branch) and editing the gates — CI configuration, the guard patterns, the allowlists. A change that alters the guard it is being judged by has removed the only thing capable of contradicting it, and it is not made safe by being correct.

The breach procedure

A breach is not a mistake. It is the map being wrong, which is the normal condition of maps. What makes it expensive is absorbing it.

Stop at the discovery. Not at the end of the current edit, not after "just finishing this file". The reason is not tidiness: the discovery is evidence that the map's method missed something, so every other surface the same method cleared is now suspect. Continuing to work against a map you have just falsified is the actual risk.

Re-enter the mapping skill with the new fact. It re-runs its searching with the discovery as an input — often the same class of thing exists in three more places, and finding two of them by accident is worse than finding all four on purpose.

Then take exactly one of three dispositions, in the open:

Disposition When What it costs
Extend the discovery belongs to this change and does not alter its shape re-declare the budget with the new rows, announce the extension and the re-scored band
Split the discovery is real work with its own surfaces land what is inside the original budget; carry the rest into a change with its own map
Abandon the discovery invalidates the approach say what was found — that finding is usually worth more than the change was

The fourth option — absorb it, it is small and related and right there — is the one everyone takes by default and the one the artifact exists to remove. It is how a two-file change becomes an eight-file change, and how review stops being about correctness and becomes an argument about scope.

Verifying the budget after the fact

Two checks, both cheap:

  • Diff ⊆ ALLOWED. List the paths the change touched and subtract the budget. A non-empty remainder is either an undeclared side effect or an extension that never got written down.
  • EXPECTED EFFECT ⊆ observed. For each expected effect, name the gate observation that confirms it happened. An expected effect nobody observed is a prediction, not a result.